Select the language by clicking the flag
Main Page
Personnel
News
Environment Footprint
Services
Guide for Housing
Forms
Extranet
Diary of Installation of a Moisture Isolation
Implementation of supervision for personnel certification for various operations
DATA OF INFORMER:
Fields marked with asterisk are obligatory
Name:
*
Tel:
*
E-mail:
Name of the housing co-operative or the address:
*
Apartment:
*
Installation time:
*
Constractors, names and tel. numbers:
*
Supervisor and tel. number:
*
Workman of moisture isolation:
*
Certification number of the workman:
*
Wet rooms, amount or area:
*
Floor area:
Wall area:
Base floor material:
*
Base wall material:
*
Surface structure with trade marks
Filler:
*
Primer:
*
Moisture isolation:
*
Well types and flanges:
*
Reinforcement of the moisture isolation:
*
Adhesive:
*
Tiles:
*
Grout:
*
Bushing products:
*
Elastics seams:
*
Measurements (result and apartment)
Consumption wall/apartment, measured:
*
Result kg/m²:
*
Consumption floor/apartment, measured:
*
Result kg/m²:
*
Film thickess on walls, measured:
*
Result mm:
*
Film thickess on floor, measured:
*
Result mm:
*
Concrete moisture %:
*
Concrete age months:
*
Floor gradient:
*
Air Temperature:
*
Floor heating:
*
Guide has been delivered to the workman:
Yes
No
Notes if any:
What month comes after July? ¹
*
¹ Why we are asking this?
There are a lot of robots who are looking for security holes in systems using these forms. If such a revision did not exist, we would get every day dozens or even hundreds of empty emails.
Submit
Reset